2009年6月安徽省寿县古城区南门外,寿春城计生服务站新建工程工地上,工人们正热火朝天的忙碌着,工地四周已经筑起了高高的围墙,围墙里挖掘机、推土机已经到位,准备开始作业。这块工地刚好位于国宝级文物单位“寿春城遗址”内,在这里必须经过文物部门勘测认定后才能动工,但由于工程量大、时间紧张,这块地地面又很不平整,所以建筑公司想边动工边走程序,便提前准备开始平整地面了。工程队忙碌了两天,清除了大部分的杂物。在这块工地的中间部位有一块明显的隆起,机器停留在这里的时间也明显较长。机器操作人员一心只想快点把工作完成,庞大的机械大手在地面上胡乱的发泄,几个小时后,偌大
June 2009 Shouxian ancient city in Anhui Province outside the south gate, Shouchun City Family Planning Service Station new construction site, the workers are busy in full swing around the site has built a high wall, excavators in the fence, bulldozers have been In place, ready to start homework. This site is located just in the national treasure-level cultural relics unit “Shouchun City ruins ”, where must go through the cultural relics department survey found that after the start, but due to large quantities, time constraints, the ground is very uneven, so the building The company wanted to start working while walking program, they prepared in advance to start leveling the ground. Engineering team busy for two days, cleared most of the debris. There was an obvious uplift in the middle of the site, and the time it took for the machine to stay there was significantly longer. Machine operators only wanted to hurry to complete the work, a huge mechanical hand on the ground casually vent, a few hours later,